Mostly everything was done Friday, but there was a delay in the flooring guy's schedule and he ended up coming in on Saturday to put the final finishing coat on the floor, and then, though tantalizing, we could not go into the kitchen until Saturday night!
But then all day Sunday and Monday we began moving our kitchen belongings back in. We have SO much space!! Take a look:
We are so happy with how things turned out! Yet to come - Back splash, side splash (4 inches of the recycled glass along the sink wall), and of course the back-ordered tile back splash behind the range. But at this point, the anxiety is gone, because we have our kitchen back, and the final touches are just icing on the cake!
:)